10.05.2014 - 26.05.2014 02:00
Construction work: Between Donaueschingen and Immendingen on the Offenburg - Singen (Htw) line, only limited train services are operating.
Trains IRE 32xx Neustadt (Schwarzw) - Ulm Hbf are cancelled between Donaueschingen and Immendingen.
Replacement bus services are operating Geisingen - Immendingen.
Please pay attention to the changed departure and arrival times.
The bus/train connections are guaranteed in Immendingen.
Please allow for a longer travelling time.
The transportation of bicycles is excluded.
Duration of construction work from:
10.05.2014 05:00 until 11.05.2014 close of services.
17.05.2014 05:00 until 18.05.2014 close of services.
24.05.2014 05:00 until 25.05.2014 close of services.
Please listen to the loudspeaker announcements in the train.
Please note the information at the station.
The online timetable at www.sbb.ch has been changed.
Flyer + Bus
Construction work: Between Donaueschingen and Immendingen on the Offenburg - Singen (Htw) line, only limited train services are operating.
Trains IRE 32xx Neustadt (Schwarzw) - Ulm Hbf are cancelled between Donaueschingen and Immendingen.
Replacement bus services are operating Geisingen - Immendingen.
Please pay attention to the changed departure and arrival times.
The bus/train connections are guaranteed in Immendingen.
Please allow for a longer travelling time.
The transportation of bicycles is excluded.
Duration of construction work from:
10.05.2014 05:00 until 11.05.2014 close of services.
17.05.2014 05:00 until 18.05.2014 close of services.
24.05.2014 05:00 until 25.05.2014 close of services.
Please listen to the loudspeaker announcements in the train.
Please note the information at the station.
The online timetable at www.sbb.ch has been changed.
Flyer + Bus