Quantcast
Channel: Rail traffic information
Viewing all articles
Browse latest Browse all 19539

Construction work: Däniken (SBB CFF FFS)

$
0
0
10.05.2014 01:10 - 12.05.2014 05:30

Construction work: The station Däniken on line Olten - Aarau is for rail traffic only limited passable.

Intercity trains ICN 5xx/15xx Genève-Aéroport/Lausanne - Zürich HB - St. Gallen are cancelled between Olten and Aarau.

Regional trains RE 36xx Olten - Wettingen are cancelled between Olten and Aarau.

The trains IC 8xx Brig - Zürich HB - Brig make an unscheduled stop in Olten.
The trains IR 20xx Zürich HB - Olten - Bern - Zürich HB make an unscheduled stop in Aarau.
Please allow for a longer travelling time.

Duration of construction work from 10.05.2014 01:10 until 12.05.2014 05:30.

Please listen to the loudspeaker announcements in the train.
Please note the information at the station.

The online timetable at www.sbb.ch has been changed.

Viewing all articles
Browse latest Browse all 19539

Trending Articles