05.05.2014 05:30 - 23.05.2014
Construction work: The postbus service L 100 between Aarberg, Schwimmbad and Aarberg, Post/Bahnhof is limited.
The buses L 100 are being rerouted.
The stop Aarberg, Schwimmbad is not serviced.
Duration of construction work from 05.05.2014 05:30 until 23.05.2014 23:59.
The online timetable at www.sbb.ch has not been changed. Please pay attention to the information in this announcement.
Construction work: The postbus service L 100 between Aarberg, Schwimmbad and Aarberg, Post/Bahnhof is limited.
The buses L 100 are being rerouted.
The stop Aarberg, Schwimmbad is not serviced.
Duration of construction work from 05.05.2014 05:30 until 23.05.2014 23:59.
The online timetable at www.sbb.ch has not been changed. Please pay attention to the information in this announcement.