06.10.2014 05:10 - 10.10.2014 17:00
Construction work: Between Worb Dorf and Worbboden on the Bern - Worb line, no train services are operating.
S-Bahn trains S7 are cancelled between Worb Dorf and Worbboden.
Replacement bus services are operating Worb Dorf - Worbboden - Worb Dorf.
The train/bus connections are guaranteed.
Please allow for a longer travelling time.
Duration of construction work from 06.10.2014 05:00 until 09.10.2014 close of services.
Please listen to the loudspeaker announcements in the train.
Please note the information at the station.
The online timetable at www.sbb.ch has not been changed. Please pay attention to the information in this announcement.
Construction work: Between Worb Dorf and Worbboden on the Bern - Worb line, no train services are operating.
S-Bahn trains S7 are cancelled between Worb Dorf and Worbboden.
Replacement bus services are operating Worb Dorf - Worbboden - Worb Dorf.
The train/bus connections are guaranteed.
Please allow for a longer travelling time.
Duration of construction work from 06.10.2014 05:00 until 09.10.2014 close of services.
Please listen to the loudspeaker announcements in the train.
Please note the information at the station.
The online timetable at www.sbb.ch has not been changed. Please pay attention to the information in this announcement.