08.09.2014 08:00 - 12.09.2014 16:26
Construction work: Between Stein am Rhein and Stammheim on the Stein am Rhein - Winterthur line, no train services are operating.
S-Bahn trains S29 are cancelled between Stein am Rhein and Stammheim.
Replacement bus services are operating Stein am Rhein - Stammheim.
The bus/train connections are guaranteed in Stammheim.
The transportation of bicycles is excluded.
Duration of construction work from 08.09.2014 until 12.09.2014 from 08:25 until 16:25 o'clock.
Please listen to the loudspeaker announcements in the train.
Please note the information at the station.
The online timetable at www.sbb.ch will be changed.
Construction work: Between Stein am Rhein and Stammheim on the Stein am Rhein - Winterthur line, no train services are operating.
S-Bahn trains S29 are cancelled between Stein am Rhein and Stammheim.
Replacement bus services are operating Stein am Rhein - Stammheim.
The bus/train connections are guaranteed in Stammheim.
The transportation of bicycles is excluded.
Duration of construction work from 08.09.2014 until 12.09.2014 from 08:25 until 16:25 o'clock.
Please listen to the loudspeaker announcements in the train.
Please note the information at the station.
The online timetable at www.sbb.ch will be changed.