Quantcast
Channel: Rail traffic information
Viewing all articles
Browse latest Browse all 19539

Construction work: Stein am Rhein - Stammheim (THURBO)

$
0
0
08.09.2014 08:00 - 12.09.2014 16:26

Construction work: Between Stein am Rhein and Stammheim on the Stein am Rhein - Winterthur line, no train services are operating.

S-Bahn trains S29 are cancelled between Stein am Rhein and Stammheim.
Replacement bus services are operating Stein am Rhein - Stammheim.
The bus/train connections are guaranteed in Stammheim.

The transportation of bicycles is excluded.

Duration of construction work from 08.09.2014 until 12.09.2014 from 08:25 until 16:25 o'clock.

Please listen to the loudspeaker announcements in the train.
Please note the information at the station.

The online timetable at www.sbb.ch will be changed.

Viewing all articles
Browse latest Browse all 19539

Trending Articles