28.06.2014 04:00 - 30.06.2014 02:00
Construction work: Between Neustadt (Schwarzw) and Löffingen on the Freiburg (Breisgau) - Neustadt (Schwarzwald) - Donaueschingen line, no train services are operating.
Trains IRE - RE are cancelled between Neustadt (Schwarzw) and Löffingen.
Replacement bus services are operating Titisee - Neustadt (Schwarzwald) - Löffingen. The transportation of bicycles is excluded.
The bus/train connections are not guaranteed.
Please allow for approx. 30 minutes more travel time.
Duration of construction work from 28.06.2014 04:00 until 29.06.2014 close of services.
Please listen to the loudspeaker announcements in the train.
Please note the information at the station.
The online timetable at www.sbb.ch will be changed.
Flyer DB
Construction work: Between Neustadt (Schwarzw) and Löffingen on the Freiburg (Breisgau) - Neustadt (Schwarzwald) - Donaueschingen line, no train services are operating.
Trains IRE - RE are cancelled between Neustadt (Schwarzw) and Löffingen.
Replacement bus services are operating Titisee - Neustadt (Schwarzwald) - Löffingen. The transportation of bicycles is excluded.
The bus/train connections are not guaranteed.
Please allow for approx. 30 minutes more travel time.
Duration of construction work from 28.06.2014 04:00 until 29.06.2014 close of services.
Please listen to the loudspeaker announcements in the train.
Please note the information at the station.
The online timetable at www.sbb.ch will be changed.
Flyer DB