02.06.2014 22:10 - 05.06.2014
Construction work: Between Wiler and Solothurn on the Burgdorf - Solothurn line, no train services are operating.
Trains are cancelled between Wiler and Solothurn.
Replacement bus services are operating Wiler - Solothurn.
The bus/train connections are guaranteed in Wiler.
Please allow for approx. 10 minutes more travel time.
The transportation of bicycles is excluded.
Duration of construction work from 02.06.2014 until 05.06.2014 from 22:10 until close of services.
Please listen to the loudspeaker announcements in the train.
Please note the information at the station.
The online timetable at www.sbb.ch will be changed.
Busstop Biberist
Busstop Gerlafingen
Construction work: Between Wiler and Solothurn on the Burgdorf - Solothurn line, no train services are operating.
Trains are cancelled between Wiler and Solothurn.
Replacement bus services are operating Wiler - Solothurn.
The bus/train connections are guaranteed in Wiler.
Please allow for approx. 10 minutes more travel time.
The transportation of bicycles is excluded.
Duration of construction work from 02.06.2014 until 05.06.2014 from 22:10 until close of services.
Please listen to the loudspeaker announcements in the train.
Please note the information at the station.
The online timetable at www.sbb.ch will be changed.
Busstop Biberist
Busstop Gerlafingen